Nedia Enterprises, Inc. complete line of erosion control, sediment control, and bioengineering products
Home | Bioengineering | Product Selection Guideline | Products | Installation Guidelines | Contact Us | Request for Quote | Site map
 
About the Company
Bioengineering
 
KoirMat™ 400,700 & 900
Typical Applications
Installation Guidelines
Installation on Slopes
Installation in Channels
Technical Specification
Photo Gallery
 
complete line of erosion control, sediment control, and bioengineering products
Nedia Enterprises offers a complete line of erosion control, sediment control, and bioengineering products made primarily from natural fibers. We provide innovative quality products and excellent service to our customers in the erosion control and bioengineering industry.
 
 
complete line of erosion control, sediment control, and bioengineering products
Products - Woven Coir Fabrics - Installation in Channels
Woven Coir Fabrics - KoirMat™ 400, 700 & 900 - Installation in Channels
Site Preparation:
Grade and shape the area of installation. If applicable, prepare seedbed by loosening 2” to 3” of topsoil. Application of lime and mixed grade fertilizer is recommended prior to seeding and installation of blankets & matting's. Make sure soil is free of clods, rocks, wood and other obstructions so that the blankets & matting's are in direct contact with soil.
Seeding:
In most cases, it is recommended that seeding be done prior to installation of blankets. For turf reinforcement mat and open weave matting, seeding is often done after matting installation. Best results are achieved when a veneer of soil is raked over the broadcast seeded surface. Straw or hay mulch may be added after seeding. All check slots and other areas disturbed during installation process should be re-seeded.
Anchoring:
U-shaped metal staples (11-gauge minimum, 6” to 12” long) or wooden stakes (at least 12” long) can be used to anchor blankets to the ground. Keep a minimum edge distance of 2” from the edge of the blanket to the center of the staples or stakes.
Installation in Channels

  • Grade soil, fertilize and seed as per general guidelines below.

  • Dig a 12” x 12” initial anchor trench at the upstream end (see Fig.4). If there is concentrated flow at channel entrance, it is recommended that the initial anchor trench be made at least 12” upstream from the pipe opening. It is also recommended to adopt measures to reduce the velocity of flow at pipe opening.

  • Dig intermittent check slots (6” deep and 6” wide) across the channel at 25’ to 50’ intervals depending on the slope gradient of the channel (see Fig.5).

  • Dig 6” deep and 6” wide longitudinal trenches at the top of side slopes to anchor the blanket edges (see Fig.6).

  • Dig 12” deep and 12” wide terminal anchor trench at downstream end (see Fig.7).

  • Install the first blanket in the initial anchor trench, upstream, in the center of the channel and anchor with two staggered rows of staples at 6” spacing, backfill and compact. Do not stretch, but make sure there is full contact between blanket and soil.

  • Do not stretch' but make sure there is full contact between blanket and soil.

  • In the same manner, position adjacent blankets in the initial anchor trench overlapping the preceding blanket a minimum of 8” and anchor.

  • Unroll center strip downstream.

  • Unroll adjacent mats downstream in a similar fashion, maintaining a 8” wide overlap. Anchor the overlapped area with staples at 16” to 18” spacing depending upon the flow velocity.

  • For anchoring the middle of the blankets see “Staple Pattern Guide for Channels” below.

  • Secure the edges of the blankets along the longitudinal trenches on the top of slopes with staples at 12” centers (see Fig.6).

  • Fold and secure the matting snugly into all transverse check slots. Lay the matting in the bottom of the slot and then fold back against itself. Anchor through both layers of blanket at 6” intervals then backfill and compact soil (see Fig.5).

  • For noncritical installations, place two staggered rows of staples at 6” spacing in lieu of check slots.

  • When blankets need to be spliced, place upstream blanket over the downstream blanket with an overlap of at least 12”. Use two staggered rows of staples at 6”spacing.

  • Anchor, fill and compact downstream end matting in terminal anchor trench (see Fig.7).

Staple Pattern Guide for Channels
Erosion Control Blankets - Installation   Erosion Control Blankets - Installation
Fig. 1
Staple Pattern Guide For Channels
  Fig. 2
Staple Pattern Guide For Channels
Erosion Control Blankets - Installation   Erosion Control Blankets - Installation
Fig. 3
Installation on channels
  Fig. 4
Initial anchor trench for channels
Erosion Control Blankets - Installation   Erosion Control Blankets - Installation
Fig. 5
Intermittent check slot
  Fig. 6
Longitudinal anchor trench
Erosion Control Blankets - Installation
Fig. 7
Terminal anchor trench for slopes and channel
Coconut Fiber
Jute Fiber
Home | Bioengineering | Product Selection Guideline | Products | Installation Guidelines | Contact Us | Request for Quote | Site map

© 2014 Nedia Enterprises Inc. All rights reserved.
Site maintained by iFactor Solutions.
Unauthorized use of images and content is strictly prohibited.

iFactor Solutions iFactor Solutions : Indian website design and development company - 
Ecommerce software, XML, PHP, Flash, Intranet solutions and estore development, operating from  Kerala, India